Product Description
This backboard combo from Lifetime Products features a 44" Impact Backboard and a black Slam-It Rim. The Impact backboard is molded of high-density polyethylene and has UV-protected, fade-resistant graphics. The 18" Slam-It® Rim is made of 5/8" solid steel with 1/2" steel braces and double compression springs includes a heavy-duty nylon net. The universal mounting bracket is available for purchase and provides a solid attachment when mounting the backboard directly to a roof, eave or wall. So enjoy the versatility of a backboard combo from Lifetime Products and play the game the way you want.
Product Details
- Amazon Sales Rank: #160225 in Sports & Outdoors
- Size: One Size
- Color: multicolor
- Brand: LIFETIME
- Model: 3241
- Dimensions: 24.00 pounds
Features
- 44" Impact Backboard Constructed of High-Density Polyethylene Plastic
- Black Slam-It Rim
- Fade Resistant Graphics on board
- All Weather Nylon Net
Posted by , Published at 6:46 AM and have